Paurashava Plan Approval
Planning a construction project in a municipal area of Bangladesh? Securing Paurashava Plan Approval is the essential first step. The approval ensures your project complies with the local rules set by the municipal authority (Paurashava), safeguarding legal and regulatory adherence.
At GEO Static, we streamline the Paurashava approval process, making it efficient and hassle-free.

Key Steps in the Paurashava Plan Approval Process
The Paurashava Plan Approval Process might seem challenging, but understanding its key steps makes it more approachable. Here’s a simple step-by-step guide to help you understand the key stages of the process:
- Application Submission: Start by applying the relevant Paurashava authority. It’s important to include all required documents and ensure your architectural and structural plans meet Paurashava’s building codes.
- Document Review: The municipal office will review your submission to ensure it complies with zoning laws, safety standards, and urban planning guidelines.
- Site Inspection: Engineers or officials from the Paurashava may visit the project site to verify land details and assess conditions.
- Plan Assessment: The authorities evaluate the design, ensuring it aligns with municipal regulations and guidelines.
- Approval or Feedback: If your plans meet the requirements, the Paurashava grants approval. If adjustments are needed, they’ll request revisions before granting final approval.
- Construction Permit: After approval, you’ll receive a construction permit, allowing your project to move forward.
- Occupancy Certificate: Once construction is complete, the Paurashava conducts a final inspection to issue an occupancy certificate, confirming the building is safe and compliant.
By following these steps, you can ensure a smoother approval journey and move forward with confidence in your construction project.
Necessary Documents for Paurashava Plan Approval
Having all the required documents in place can make your Paurashava plan approval process quicker and hassle-free. Below is a list of essential documents you’ll need to gather for your application:
Document Type | Details | Copies Required |
Land Ownership Documents | Land deed, Khatian, or Namjari to prove ownership. | 2 copies |
Architectural Drawings | Certified drawings by a registered architect and engineer. | 2 copies |
Structural Drawings | Detailed structural plans from a certified professional. | 2 copies |
Mouza Map & Location Plan | A map indicating the exact location and boundaries of the land. | 2 copies |
National ID (NID) or Passport Copy | Proof of identity for the applicant. | 1 copy |
TIN Certificate | Taxpayer Identification Number for tax verification. | 1 copy |
Soil Test Report | A report indicating soil conditions, if applicable. | 1 copy (if applicable) |
Environmental Clearance | Required for larger or environmentally sensitive projects. | 1 copy (if applicable) |
Bank Receipt | Payment receipt for the application fee. | 1 copy |
Note:
- Some documents may require notarisation or certification depending on your local Paurashava regulations.
- For government-allocated lands, additional documents such as lease deeds or allotment letters may be required.
By preparing these documents in advance, you’ll ensure that your application is ready for submission, minimizing delays and improving your chances of timely approval.
At GEO Static, we can assist in collecting, verifying, and organising all the necessary documents for your Paurashava plan approval.

Paurashava Plan Approval Services by GEO Static Bangladesh
We understand how crucial it is to get your Paurashava plan approved without delays or complications. That’s why we offer a full suite of services to guide you through every step of the approval process:
- Document Preparation: We handle all the paperwork, ensuring every document is in order, complete, and ready for submission. You won’t have to worry about missing anything important.
- Drawing Submissions: Our team collaborates with your architects and engineers to ensure your architectural and structural drawings meet Paurashava’s regulations, saving you time and avoiding rejections.
- Application Monitoring: We keep a close eye on the progress of your application. If there are any issues or delays, we handle the follow-ups to keep things moving smoothly.
- Revisions & Adjustments: If your plans need revisions to meet Paurashava’s requirements, we provide expert guidance and help implement changes quickly, ensuring your application stays on track.
- Final Approvals & Permits: From securing your construction permit to getting the final occupancy certificate, we are here to support you at every stage of the process.
With GEO Static by your side, you can rest easy knowing that we’ll handle the formalities while you focus on bringing your vision to life. We make sure your Paurashava plan approval is fast, smooth, and stress-free.
Why Choose GEO Static BD for Paurashava Plan Approval?
When it comes to securing your Paurashava plan approval, you need a reliable partner who understands the ins and outs of the process. Here’s why GEO Static is the ideal choice for your approval journey:
- Expertise You Can Rely On: With years of experience in handling Paurashava approvals, we know exactly what’s required to get your plans approved without unnecessary delays.
- Support Tailored to Your Needs: Every project is different. We take the time to understand your unique requirements and provide personalised support to make the process as smooth as possible.
- Efficient and Timely: We’ve perfected a streamlined process that reduces paperwork errors and prevents delays. Our efficient approach means your approval process moves forward without unnecessary hold-ups, helping you stay on schedule.
- In-Depth Local Knowledge: Understanding local Paurashava rules and regulations is crucial. With our strong grasp of municipal zoning laws and approval procedures.
- A Proven Track Record: Our portfolio speaks for itself. We’ve helped countless clients successfully navigate the Paurashava approval process, and they trust us to deliver results every time.
At GEO Static, we’re committed to making your Paurashava plan approval experience as stress-free as possible. Let us handle the details while you focus on turning your vision into reality.
The Geo Static Paurashava Plan Approval Process
Our process for Paurashava Plan Approval is designed to be simple and efficient, ensuring a smooth experience for you every step of the way:
- Consultation
We start by discussing your project details and understanding your requirements. After that, we provide a clear and transparent quote.
- On-Site Survey
Our skilled team arrives at your location with the latest surveying tools. We quickly set up and began the data collection process, working efficiently to avoid delays.
- Data Analysis
As we gather data, it’s processed in real-time. This allows us to adjust as needed, ensuring the accuracy of our survey.
- Delivery
Once the survey is complete, we compile all the data into a detailed, easy-to-read report. This includes maps and any critical information you need.
With our streamlined process, you can trust that your Paurashava Plan Approval will be completed efficiently and accurately, giving you the insights you need to move forward with your project. Contact GEO Static today to get started!
FAQs
Q: How long does the Paurashava plan approval take?
A: The process duration varies, but typically it takes a few weeks. GEO Static ensures your documents are to speed things up.
Q: Do I need an architect for the approval process?
A: Yes, certified architectural and structural drawings are mandatory for submission.
Q: Can GEO Static handle the entire approval process?
A: Absolutely! From document preparation to final approval, we guide you through every step.
Q: What if my application is rejected?
A: Don’t worry. If revisions are required, we’ll assist in making necessary adjustments and resubmitting the application.
Our Process
Four Steps to Get Our Services

Make Appointment

We Check The Location
Start Land Survey
