Geo Static Survey

KDA Plan Approval

Are you planning a construction project in Khulna? Whether it’s a residential, commercial, or industrial development, securing KDA (Khulna Development Authority) plan approval is your first and most important step. This ensures your project complies with local regulations and avoids potential roadblocks.

At GEO Static, we specialise in making the KDA plan approval process hassle-free. From paperwork to final approvals, we handle it all while you focus on your construction vision.

Plan approval 2

Overview of KDA Plan Approval Process

Securing KDA plan approval in Khulna may appear daunting, but breaking it down into simple steps can make the entire process much clearer. Here’s how the KDA plan approval process works:

  1. Application Submission: The first step is to submit a formal application to the Khulna Development Authority (KDA). This includes detailed architectural and structural plans, along with documents that prove you legally own the land.
  2. Document Review:  Once your application is submitted, KDA will thoroughly review your documents. They check if your land complies with zoning laws, land use regulations, and safety standards. T
  3. Site Inspection: After the document review, a KDA official will visit your site. The purpose is to assess if the proposed construction fits with the land’s physical characteristics and to ensure your plans align with the real-world conditions of the location.
  4. Feedback and Revisions: If KDA identifies any issues or discrepancies, they will provide feedback and request revisions. It’s essential to address any changes quickly to avoid delays and keep the process moving forward smoothly.
  5. Approval and Permit: Once your plans pass the scrutiny of KDA and all required changes are made, you’ll receive the formal approval. This includes the construction permit, allowing you to begin the construction process.
  6. Completion and Final Inspection: After your construction is completed, KDA will conduct a final inspection to ensure everything is built according to the approved plans. If all standards are met.

 

Understanding each step of the KDA approval process is crucial for ensuring your construction project is compliant with local regulations. With GEO Static handling the paperwork and process management.

Necessary Documents for KDA Plan Approval

Getting the KDA plan approval for your construction project in Khulna involves submitting several key documents. To ensure your application is processed smoothly, having all the necessary paperwork in order is essential. 

Here’s a detailed list of the documents you’ll need to submit:

Document

Description

RS Mouza Map

A map showing the location of your land in the relevant RS mouza is necessary for the factory setup permission.

Completed Application Form

Forms that need to be filled out and submitted to KDA for permission to begin construction.

Certified True Copies of Documents

A certified copy of documents proving land ownership and other relevant legal paperwork.

Attested Photo Copies of National Identity Card

Clear copies of your National ID card, attested by a certified authority.

Police Report (FIR)

A police clearance report, confirming there are no legal issues related to the land or your construction plans.

Indemnity Bond

A bond on Rs. 500/- non-judicial stamp paper, declaring your responsibility for any legal liabilities.

Attested Copy of Power of Attorney

If someone else is applying on your behalf, include an attested copy of the power of attorney authorising them.

Search Certificate

A certificate confirming the legal status of the land and its title.

Proof of Construction

Evidence that the construction has started or that the land is being developed, as required by KDA regulations.

Having these documents ready and properly attested will help speed up the approval process and reduce the risk of any delays. 

At GEO Static, we assist in gathering, verifying, and organising these documents, ensuring everything is submitted accurately. Let us handle the paperwork so you can focus on the construction of your project!

Engineering Survey

KDA Plan Approval Services by GEO Static

Navigating the KDA (Khulna Development Authority) plan approval process can be challenging, but with GEO Static, it doesn’t have to be. We offer a wide range of services to make sure your project moves forward smoothly.

Here’s how we assist:

  1. Document Preparation and Submission: We help you gather all the necessary documents and ensure they are properly prepared for submission to the KDA.
  2. Plan Compliance and Design Assistance: Our team works directly with your architects and engineers to ensure that your project designs align with KDA regulations.
  3. Application Monitoring and Follow-up: Once your application is submitted, we monitor its progress closely. If any issues arise during the review, we proactively address them, ensuring your application stays on track and moving forward.
  4. Revisions and Resubmissions: If the KDA requires changes to your plans, we provide detailed assistance with revising and resubmitting your application. Our experts guide you in making the necessary adjustments.
  5. Final Approval and Permit Assistance: We support you through the final stages, from securing your construction permit to obtaining the occupancy certificate once construction is complete.

 

With GEO Static’s expertise, the KDA approval process becomes more efficient and less stressful, ensuring you stay focused on your construction goals without worrying about regulatory hurdles.

Why Choose GEO Static for KDA Plan Approval?

Getting your KDA (Khulna Development Authority) plan approval, and having a trusted partner like GEO Static can make a world of difference. Here’s why we’re the ideal choice for your project:

  1. Expertise You Can Trust: With years of experience in handling KDA plan approvals, we know the process inside out. Our knowledge ensures your application is prepared accurately, helping avoid unnecessary delays.
  2. Tailored Service for Your Project: Every construction project is unique. We take the time to understand your specific needs and customise our services to match the requirements for your KDA approval.
  3. Efficiency and Quick Turnaround: We know that time is crucial in construction. By streamlining the approval process, we ensure your documents are submitted correctly and quickly, reducing waiting time and speeding up your project’s start.
  4. Comprehensive End-to-End Support: From gathering documents to following up on your application, we offer full support at every stage. You can rely on us to manage the paperwork while you focus on your build.
  5. Proven Success and Reliability: Our track record speaks volumes. With numerous successful KDA plan approvals, you can trust GEO Static to get your project approved efficiently and effectively.

 

Choosing GEO Static for your KDA plan approval means choosing a team that understands the complexities of the process and can get your project approved with ease. Let us take care of the paperwork so you can focus on building!

The Geo Static KDA Plan Approval Process

Our process for KDA Plan Approval is designed to be simple and efficient, ensuring a smooth experience for you every step of the way:

We start by discussing your project details and understanding your requirements. After that, we provide a clear and transparent quote.

Our skilled team arrives at your location with the latest surveying tools. We quickly set up and began the data collection process, working efficiently to avoid delays.

As we gather data, it’s processed in real-time. This allows us to adjust as needed, ensuring the accuracy of our survey.

Once the survey is complete, we compile all the data into a detailed, easy-to-read report. This includes maps and any critical information you need.

With our streamlined process, you can trust that your KDA Plan Approval will be completed efficiently and accurately, giving you the insights you need to move forward with your project. Contact GEO Static today to get started!

FAQs

Q: How long does the KDA plan approval process take?

A: It typically takes a few weeks to a few months, depending on the project’s complexity and document completeness.

Q: Do I need an architect for KDA approval?

A: Yes, architectural and structural plans must be prepared by licensed professionals.

Q: Can GEO Static manage the entire KDA approval process?

A: Absolutely! From preparing documents to tracking your application, GEO Static handles everything for you.

Q: What happens if my plans are rejected?

A: If KDA requires changes, we’ll work with you to revise and resubmit your plans for approval.

Our Process

Four Steps to Get Our Services

Make Appointment

We Check The Location

Start Land Survey

Survey Completed

01602060802